Flourescentes
Eurosalqui cumple 30 años
Corten Steel Verdigris
Process that transforms a surface into bicolor corten steel, with a high aesthetic value that also protects the surface from corrossion.
The application of the process following the guidelines of the notes that we describe in the process, is important for the achievement of the result.
PROCESO ACERO CORTEN
Let dry for 24 hours.
Surface sanding with 280 – 320 grit.
For other surfaces, ask to our technical department for other posible products to be used as first layer, to guarantee adhesions.
Let dry for 18 hours under normal conditions of humidity and temperature.
Once dry, sand with very fine grain (400 – 600).
Let dry for 20’.
we avoid the posible change of tone by applying one layer of IH-001.
Apply between 40 – 80 g/m2. Let dry.
Application of a final protection, depending of the final use for this decorational effect.